Improving energy efficiency at the company
From November 2025 to June 2026, with the support of AS "Attīstības finanšu institūcija Altum", the project "Energoefektivitātes paaugstināšana uzņēmumā" (Improving energy efficiency at the company) was carried out at the production unit of SIA "Žogu fabrika" at Kalnciema ceļš 134A, Jelgava. The total cost of the project is EUR 403,147.80, of which European Union funding is EUR 308,268.00. The capital rebate amounts to EUR 99,954.00.
As part of the project, solar panels for self-consumption with a total capacity of 0.266 MW were installed.
The energy efficiency measures will provide heat energy savings and a reduction in greenhouse gas emissions. The panels are planned to generate 220,286 kWh of electricity for self-consumption per calendar year.